<< Previous |
|
Here we are at the west end of town, looking
back toward the east. In the foreground, the first switch is
to the passing siding. The next switch (on the passing siding)
will be the spur to the loading area of the Spencer mill. The
depressed area (where all the tool clutter is resting) is the mill
pond. It really can't be discerned in these photos, but there
are four levels of roadbed in this area. There will be three
different rail weights. I think the finished scene will have a
nice look to it. |
|
Next >>
|